[Press Release] Completion of Half Height Platform Screen Doors on East West Line
#1
Completion of Half Height Platform Screen Doors on East West Line

1. The Land Transport Authority (LTA) is pleased to announce the completion of the installation of half height platform screen doors on all elevated stations on the East West Line.

2. Expo Station is the final station on the 49.2km line to be fitted with the platform screen doors.

3. To date, 26 out of the 36 elevated MRT stations island-wide have been fitted with the 1.6m high platform screen doors.

4. Mr Chua Chong Kheng, Group Director (Thomson and Existing Lines) said: "We are pleased to complete the installation of the half height platform screen doors on all the East West Line elevated stations on schedule, despite the challenges of working on operational stations. With the experience gained from the installation work at the completed stations, we will push ahead to complete the remaining 10 stations on the North South Line by June 2012."

Remaining stations on North South Line completed by June 2012

5. Pasir Ris, Jurong East and Yishun were the first three stations fitted with platform screen doors in 2009. Work has started on the remaining 10 (1) elevated stations on the North South Line and is on track to be completed progressively by June 2012.

6. The installation of the platform screen doors typically take four to six months at each MRT station as works can only be carried out during the non-operational hours between 1.30am and 4.00am. Furthermore, at any one time, only a limited number of stations are available for the installation of the platform screen doors. Nonetheless, the LTA and its contractors have worked closely with SMRT within these constraints to complete the installations as quickly as possible without compromising safety.

[1] Admiralty, Ang Mo Kio, Choa Chu Kang, Khatib, Kranji, Marsiling, Sembawang, Woodlands, Yew Tee and Yio Chu Kang
My Darling is a fishball and its tail is too powderful Tongue

Heart 47/48
[-] The following 4 users Like youyuan's post:
  • cclset22, SBS6060M, SMRT/SBS Transit, tiukengleng1994
Reply
#2
I thought the HHPSD's height is 1.5m?

EDIT: Remaining stations on North South Line completed by June 2012
Mark4211
Hi there! I am a railway technology enthusiast.

North South Line for openBVE [NB: MSP - BSH]
Reply
#3
(31 August 2011, 03:53 PM)Mark4211 Wrote:   Show/Hide

That is my height.1.5m.
PSDs is 1.6m as i compare my height to the PSDs.
“Every pain gives a lesson, every lessons changes a person.”

Heart-ing 211/212, 001/002, 093/094 as always

R.I.P, TIB1173K. You will be missed. Solely by me.
Reply
#4
(31 August 2011, 03:53 PM)Mark4211 Wrote:   Show/Hide

Minimum 1.5m. Meaning the doors are 15m, but the partitions between each doors are at least 1.6m.
Joey Foo
The web design/development guy.
"Have you tried the '404' page on SGTrains.com?"
joeyfoo.com @joeyfjj 

Useful links: Download openBVE / C751A
Reply


Possibly Related Threads...
Thread Author Replies Views Last Post
  Possible New MRT Line emoh 3 5,666 12 June 2019, 08:31 PM
Last Post: emoh
  [Press Release] New Addition to North-South Line: Canberra Station A380Lover 2 2,585 29 May 2019, 07:01 PM
Last Post: C151andC651SuperAUTTP
  [News Article] North-East Line, Sengkang and Punggol LRTs to move to new financing framework A380Lover 0 15,303 14 February 2018, 07:55 PM
Last Post: A380Lover
  [Press Release] Factsheet: Status of Construction of the Thomson-East Coast Line A380Lover 0 8,676 10 November 2017, 04:33 PM
Last Post: A380Lover
  [Press Release] LTA Awards Final Construction Contract for Circle Line 6 A380Lover 0 7,914 10 November 2017, 04:05 PM
Last Post: A380Lover
  [News Article] North-South, East-West lines will ‘likely’ see shortened operating hours on weekdays: C151 - 061/062 0 7,553 08 November 2017, 08:23 AM
Last Post: C151 - 061/062
  [News Article] Thomson-East Coast Line could be extended to connect to Changi Airport A380Lover 7 6,535 29 April 2017, 09:49 AM
Last Post: xavier2002
  [Press Release] Completion of Sleeper Replacement Programme on the North-South and East-West Lines A380Lover 0 5,713 05 February 2017, 07:12 PM
Last Post: A380Lover
  [News Article] Faults affect Circle Line due to "intermittent signalling issues" A380Lover 3 3,108 26 November 2016, 01:38 PM
Last Post: A380Lover
  [Press Release] Limited Tender for Thomson-East Coast Line Operator Licence in 1Q2017 A380Lover 0 2,195 05 November 2016, 11:27 AM
Last Post: A380Lover

Forum Jump:


Users browsing this thread: 1 Guest(s)