Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
[Press Release] SBS Transit Limited to Operate Downtown Line
#71
(03 September 2011, 10:16 PM)idiiop Wrote:   Show/Hide

Thats just 3 trains, you want to compare with SMRT NSEWL Fleet? Sure lose de.
Benjamin Goh 
Forum Administrator (ORD LOH!)
SGTrains.com
Youtube | Foursquare 
Anime | Aviation | Bus | Train | Photography


今日も JR西日本をご利用くださいましてありがとうございます。この電車は環状線内回り、大阪、西九条、弁天町方面行きです。次は、桜ノ宮に泊まります。お客様にお願い致します、有線座席ではお年寄りや体の不自由なお客様、妊娠中や乳幼児をお連れのお客様がいらっしゃいましたら席をお譲り下さい。ご協力をお願いします。
Reply
#72
(03 September 2011, 10:12 PM)151Xclusive™ Wrote:   Show/Hide

Errr, that is decided LTA before SBST got the tender.
Joey Foo
The web design/development guy.
"Have you tried the '404' page on SGTrains.com?"
joeyfoo.com @joeyfjj 

Useful links: Download openBVE / C751A
Reply
#73
(05 September 2011, 10:35 PM)joeyfjj Wrote:   Show/Hide

as in maintenance wise
Benjamin Goh 
Forum Administrator (ORD LOH!)
SGTrains.com
Youtube | Foursquare 
Anime | Aviation | Bus | Train | Photography


今日も JR西日本をご利用くださいましてありがとうございます。この電車は環状線内回り、大阪、西九条、弁天町方面行きです。次は、桜ノ宮に泊まります。お客様にお願い致します、有線座席ではお年寄りや体の不自由なお客様、妊娠中や乳幼児をお連れのお客様がいらっしゃいましたら席をお譲り下さい。ご協力をお願いします。
Reply
#74
sbst trains are underground. and all sbst trains are driverless Huh
Enjoy your holidays! ~ TIB1026C
Reply
#75
(29 September 2011, 12:32 PM)Adiel Rusyaidi Wrote:   Show/Hide

There are some sbst trains that goes above ground... Crystal Movers :3


So, when DTL becomes operational, what would be the estimated loss? (you know, when profit is lower than operating costs)
- Flip
/人◕ ‿‿ ◕人\
[-] The following 1 user Likes Flip's post:
  • Mark4211
Reply


Possibly Related Threads...
Thread Author Replies Views Last Post
  Possible New MRT Line emoh 3 5,666 12 June 2019, 08:31 PM
Last Post: emoh
  [Press Release] New Addition to North-South Line: Canberra Station A380Lover 2 2,585 29 May 2019, 07:01 PM
Last Post: C151andC651SuperAUTTP
  [News Article] North-East Line, Sengkang and Punggol LRTs to move to new financing framework A380Lover 0 15,303 14 February 2018, 07:55 PM
Last Post: A380Lover
  [Press Release] Factsheet: Status of Construction of the Thomson-East Coast Line A380Lover 0 8,676 10 November 2017, 04:33 PM
Last Post: A380Lover
  [Press Release] LTA Awards Final Construction Contract for Circle Line 6 A380Lover 0 7,914 10 November 2017, 04:05 PM
Last Post: A380Lover
  [News Article] Thomson-East Coast Line could be extended to connect to Changi Airport A380Lover 7 6,535 29 April 2017, 09:49 AM
Last Post: xavier2002
  [News Article] Rapid transit system link to connect Woodlands and JB via high bridge A380Lover 0 1,550 14 December 2016, 01:50 PM
Last Post: A380Lover
  [News Article] Faults affect Circle Line due to "intermittent signalling issues" A380Lover 3 3,108 26 November 2016, 01:38 PM
Last Post: A380Lover
  [Press Release] Limited Tender for Thomson-East Coast Line Operator Licence in 1Q2017 A380Lover 0 2,195 05 November 2016, 11:27 AM
Last Post: A380Lover
  [Press Release] The Rail Report: New Signalling System, Rail Line and Extension and Trains Next Year A380Lover 0 1,621 26 October 2016, 07:40 PM
Last Post: A380Lover

Forum Jump:


Users browsing this thread: 1 Guest(s)