
This is the official thread for all Harbourvale City Routes and Trains. This thread gives the essential information for driving the routes or trains.
All the release dates listed here are the full versions, from one end to the other end of the line. Short-working trips' release dates are not considered as official release dates.
HCRT Routes
![[Image: bJpP20f.png]](https://i.imgur.com/bJpP20f.png)
Current Harbourvale City Rapid Transit System Map
Harbourvale Line
Termini: HL1 Harbourvale, HL16 Blackton Junction (future: HL18 Lower Ends), WH6 North Coast (future)
Rolling Stock: C100A
Depot(s): Square Quays Depot, District Depot
Length of line: 11km
Duration between termini: 22 minutes
Status of Line: Released
Date of 1st release of Route: -
Date of most recent release of Route: 28th August 2011 (v4.051)
Number of closed stations: One - Wynyard
Random Fact: The Harbourvale Line was the first line in the city to be opened!
Link to Thread: Harbourvale Line
Airport Express Line
Termini: AE1 Stadium, AE4 East Harbour (future: AE8 Seaview)
Rolling Stock: C100B
Depot(s): South Coast Depot
Length of line: 5km
Duration between termini: 7-10 minutes
Status of Line: Released
Date of 1st release of Route: 27th June 2011
Date of most recent release of Route: 6 August 2020 (v1.1)
Number of closed stations: One, AE7 Cliffton
Random Fact: The Airport Express Line was intended to be a branch from the Harbourvale Line.
Download Link: Airport Express Line v1.1
North West Line
Termini: NW1 South Coast, NW10 City Square
Rolling Stock: C100A
Depot(s): Square Quays Depot, District Depot
Length of line: Estimated to be 10km
Duration between termini: Estimated to be 20 minutes
Status of Line: Partially released
Date of 1st release of Route: -
Date of most recent release of Route: -
Number of closed stations: Zero
Random Fact: The line was built under HLRT's supervision until HCRT took over, thus the monotonous designs from NW1 to NW6.
Download Link: North West Line v0.8
Blackton Line
Termini: BL1 Townsville, BL13 Promenade
Rolling Stock: C591
Depot(s): Caroye Depot
Length of line: Estimated to be 12-13km
Duration between termini: Estimated to be 25-30 minutes
Status of Line: Under Construction
Date of 1st release of Route: -
Date of most recent release of Route: -
Number of closed stations: Zero
Random Fact: The tracks in this line almost never diverge and converge, they are almost always 8m apart from each other. The middle portion of the viaducts may be used for recreational purposes like a park along the tracks, obviously with fencing beside the tracks.
Download Link: -
HCRT Trains
C591
Operating on: Blackton Line, Kegstone Line
Carriages: 3
Length of Train: To-be-confirmed
Height of Train: 3-4m
Top Speed: 110km/h
Mode Of Operation: ATS/ATC
Constructed by: -
Information for other lines will be completed in the near future.
All the release dates listed here are the full versions, from one end to the other end of the line. Short-working trips' release dates are not considered as official release dates.
HCRT Routes
![[Image: bJpP20f.png]](https://i.imgur.com/bJpP20f.png)
Current Harbourvale City Rapid Transit System Map
Harbourvale Line
Termini: HL1 Harbourvale, HL16 Blackton Junction (future: HL18 Lower Ends), WH6 North Coast (future)
Rolling Stock: C100A
Depot(s): Square Quays Depot, District Depot
Length of line: 11km
Duration between termini: 22 minutes
Status of Line: Released
Date of 1st release of Route: -
Date of most recent release of Route: 28th August 2011 (v4.051)
Number of closed stations: One - Wynyard
Random Fact: The Harbourvale Line was the first line in the city to be opened!

Link to Thread: Harbourvale Line
Airport Express Line
Termini: AE1 Stadium, AE4 East Harbour (future: AE8 Seaview)
Rolling Stock: C100B
Depot(s): South Coast Depot
Length of line: 5km
Duration between termini: 7-10 minutes
Status of Line: Released
Date of 1st release of Route: 27th June 2011
Date of most recent release of Route: 6 August 2020 (v1.1)
Number of closed stations: One, AE7 Cliffton
Random Fact: The Airport Express Line was intended to be a branch from the Harbourvale Line.
Download Link: Airport Express Line v1.1
North West Line
Termini: NW1 South Coast, NW10 City Square
Rolling Stock: C100A
Depot(s): Square Quays Depot, District Depot
Length of line: Estimated to be 10km
Duration between termini: Estimated to be 20 minutes
Status of Line: Partially released
Date of 1st release of Route: -
Date of most recent release of Route: -
Number of closed stations: Zero
Random Fact: The line was built under HLRT's supervision until HCRT took over, thus the monotonous designs from NW1 to NW6.
Download Link: North West Line v0.8
Blackton Line
Termini: BL1 Townsville, BL13 Promenade
Rolling Stock: C591
Depot(s): Caroye Depot
Length of line: Estimated to be 12-13km
Duration between termini: Estimated to be 25-30 minutes
Status of Line: Under Construction
Date of 1st release of Route: -
Date of most recent release of Route: -
Number of closed stations: Zero
Random Fact: The tracks in this line almost never diverge and converge, they are almost always 8m apart from each other. The middle portion of the viaducts may be used for recreational purposes like a park along the tracks, obviously with fencing beside the tracks.
Download Link: -
HCRT Trains
C591
Operating on: Blackton Line, Kegstone Line
Carriages: 3
Length of Train: To-be-confirmed
Height of Train: 3-4m
Top Speed: 110km/h
Mode Of Operation: ATS/ATC
Constructed by: -
Information for other lines will be completed in the near future.
![[Image: nickgoh45-0.png]](http://osu.ppy.sh/stat2/nickgoh45-0.png)
Chairperson of Harbourvale City Rapid Transit

Train Reps: 85/86, 221/222