I still do not understand what is a PG intake...
Reply
(05 June 2016, 11:15 AM)Nobrakes88 Wrote:   Show/Hide

PG Intake is Powergrid Intake, which supplies power to the train line.
Reply
Oh... Do you by chance have a picture of a PG intake?
Reply
(05 June 2016, 05:35 PM)Nobrakes88 Wrote:   Show/Hide

I doubt anyone has a picture of it (NEL) , perhaps in some timelapse video you might see it. 
At most the most possible is the aboveground NSL along the KTB and YCK where you could see the PG structure.

In the new Era of transport, nothing has changed, at least visibly. Disruption still a regular, and perhaps the bus is slow and safe...
Reply
Oh you mean the 22kV substation? That building under the tracks?
Reply
(05 June 2016, 09:13 PM)AsHalt Wrote:   Show/Hide

(05 June 2016, 10:17 PM)Nobrakes88 Wrote:   Show/Hide

That was the online substation, not PG intake. For PG intake, not just 22kV, but most of them is up to 66kV.
Reply
(05 June 2016, 10:17 PM)Nobrakes88 Wrote:   Show/Hide

(05 June 2016, 11:01 PM)A380Lover Wrote:   Show/Hide

The trackside buildings are not PG Intake they are instead Online substations which are quite different. Although these infrastructure are collectively under Power, they have different functions. Shall outline our MRT's power system so that you can understand better.

The Power system first takes power from the PUB grid at 66kV AC and then steps the voltage down to 22kV AC. This is the function of the PG Intake - to take power from national grid and step it down.

After which the 22kV AC is distributed by bus bars to either the Traction Online Substations (1500V DC/750 DC) OR Service Substations (415V AC) - meant for miscellaneous use like station, signalling or comms power etc.

In these substations, power is also stepped down via transformers to the respective voltages. Rectification is also used in the Traction Online Substation to convert AC -> DC.

The Traction Online Substation is the place where the stepped down power of 1500/750 DC is fed to the overhead catenary system (OCS)/3rd rail sections located in the vicinity. It also is equipped with Inverters to help convert excess power through OCS/3rail back into 22kV AC power to be put back into the 22kV network for use in other places. As you can see we're moving up the distribution hierarchy here.

So anw I hope you can pick up 2 key terms for power: Rectification for AC -> DC and Inverter for DC -> AC

PG Intake locations are very few in number. The NEL has 2 such PG Intake at SKD and DBG.

Traction Online Substations however are located in practically almost every single station (OR along the trackside for NSEWL) since they are handling power distribution in OCS/3rail in their intermediate area.
[-] The following 2 users Like Ethan777's post:
  • A380Lover, AsHalt
Reply
Oh.. Those big fat transformers at the depots  and neat BNV are part of the PG intake system!!
 But still.... Do you have a location of the PG intakes?
Reply
Found it!!!
(From the statues)

 All that area comprised in part of Lot MK03-02357L , along Commonwealth Avenue West occupied by “Buona Vista MRT 66kV Substation” containing an area of about 3288.1 square metres and bounded approximately as follows:

 

  Commencing at the corner of the aforesaid “Buona Vista MRT 66kV Substation” which point is 32241.146 metres North and 23010.959 metres East of the Singapore Land Authority SVY 21 Datum, the boundaries run along successive lines of co-ordinates approximately as follows:

 

Northing

Easting

 

32235.707

23068.380

 

32227.668

23076.150

 

32224.071

23116.561

 

32197.456

23114.098

 

32201.096

23076.111

 

32207.454

23007.572

 

32212.287

23008.078

 

to the point of commencement.

 

  The boundaries of “Buona Vista MRT 66kV Substation” are more particularly delineated on the Survey Plan set out below.

[Image: 8e7b274f-67af-4d5b-a059-a3ddcbb495f9.jpeg]
Reply
So... Is this the PG intake substation?
Reply


Possibly Related Threads...
Thread Author Replies Views Last Post
  Discussion on CJ151 - Trains for Jurong Region Line Flip 3 17,245 13 June 2019, 03:38 PM
Last Post: A380Lover
  North South East West Lines (NSEWL) Discussion nakanoben 3,393 1,653,254 20 May 2019, 05:26 PM
Last Post: A380Lover
  Changi Airport Skytrain Discussion nakanoben 109 131,237 14 April 2019, 02:32 PM
Last Post: JKYY
  Sentosa Express Discussion Scania96-101/102 137 132,986 02 April 2019, 09:45 PM
Last Post: Fairprice
  Circle Line (CCL) Discussion WarGreymon X 1,767 1,437,551 02 April 2019, 06:04 PM
Last Post: Fairprice
  Discussion on CR151 - Replacement Trains for North-South / East-West Lines nakanoben 69 29,670 01 April 2019, 05:29 AM
Last Post: A380Lover
  Cross Island Line (CRL) / North Shore Line Discussion nakanoben 335 269,101 30 March 2019, 01:45 PM
Last Post: Fairprice
  Jurong Region Line (JRL) Discussion nakanoben 198 155,072 28 March 2019, 01:07 AM
Last Post: busanalyser
  Bukit Panjang LRT (BPLRT) & Sengkang-Punggol LRT (SPLRT) Discussion nakanoben 652 595,667 11 March 2019, 01:34 AM
Last Post: mauvd2000
  Downtown Line (DTL) General Discussion nakanoben 1,271 1,132,098 07 March 2019, 03:14 PM
Last Post: A380Lover

Forum Jump:


Users browsing this thread: 1 Guest(s)