Thread Rating:
  • 5 Vote(s) - 4.4 Average
  • 1
  • 2
  • 3
  • 4
  • 5
End-of-Life Upgrade for Kawasaki Heavy Industries C151
So, would u rather the EOL projects to continue or scrap the KHI?

A few months old news but I'm sure u all heard of LTA's sudden debate on whether to scrap our KHI/SIE or go renew their condition.

Thanks to this news, now there's a small chance of losing our 2 oldest, nostalgic models...

I personally don't like this one bit coz SMRT has alr invested in time, work plans and joint ventures with rolling stock manufacturers to get what they need to refurbish these 85 trains. Why change a workplan that is already established enough?
Reply


Messages In This Thread
RE: Kawasaki Heavy Industries C151 End-of-Life Upgrade - by Ethan777 - 09 September 2016, 10:53 PM

Possibly Related Threads...
Thread Author Replies Views Last Post
  Delivery of Kawasaki-CRRC Sifang CT251 nakanoben 97 82,538 17 January 2020, 09:56 PM
Last Post: A380Lover
  Kawasaki Heavy Industries-CSR Sifang C151A Repairs (KSF) joelong243w 1,328 1,312,326 15 January 2020, 10:11 PM
Last Post: A380Lover
  Delivery of Kawasaki-CRRC Sifang C151C nakanoben 175 96,317 23 March 2019, 12:04 PM
Last Post: saffie730
  EIS of Kawasaki Heavy Industries-CSR Sifang C151B nakanoben 332 256,190 22 May 2018, 01:29 PM
Last Post: Flip
  Delivery of Mitsubishi Heavy Industries Crystal Mover (C810A) nakanoben 35 19,267 02 August 2016, 05:10 PM
Last Post: smrtrainlovur
Information C151 & C751A High Capacity Modification (2015) nakanoben 66 28,134 15 December 2015, 12:49 PM
Last Post: smrtrainlovur

Forum Jump:


Users browsing this thread: 1 Guest(s)