Thread Rating:
  • 3 Vote(s) - 5 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Delivery of Kawasaki-CRRC Sifang C151C
#11
Actually I do have some questions here regarding NSEWL C151C trains..

Will there be any significant differences for these set of new trains in terms of train designs, themes, specifications, and interior layout as compared to C151, C151A & C151B? Smile
Warmest Regards,
Rachel (twinklerach)

970 | Bukit Panjang Int to Shenton Way
858 | Woodlands Temp Int to Changi Airport T2 (Loop)
110 | Compassvale Int via Changi Airport T4 (Loop)

120 | New Bridge Road Ter to Telok Blangah Heights (Loop)
371 | Sengkang Int to Rivervale Crescent (Loop)

In Loving Memory: TIB744U (12 Dec 1995 - 11 Dec 2014)
Reply
#12
(11 March 2015, 05:15 PM)twinklerach Wrote:   Show/Hide

Yes. For a start, C151Cs will come with foldable seats (aka tip-up seats) in the middle of each carriage, similar to those in London Underground tube stocks and Paris metro. The foldable seats will be a huge difference from the standee spaces in some C151s designated as "bar trains". 

Secondly, C151Cs will also be the firsts to come with Wireless@SG in all the carriages. Meaning, you can straightaway connect to Wireless@SG in the carriage itself and surf the internet (saving you mobile data), this is also similar to London Underground's wifi in the train carriages. 

Source: http://www.straitstimes.com/news/singapo...i-20150131
MRT Train reps: 567/568, 669/670 7083/7084, 7085/7086 857, 863

Alstom is Love Alstom is Life  Big Grin
Reply
#13
Will it sound like the C751B and C151A?
In my imagination:

The last train to Boon Lay is at platform A. The last train to Boon Lay is at platform A. Please board the train now, good night.

(Joo Koon towards Boon Lay)

Next station, Bugis. This train service will end at Marina South Pier.

(Cross-line service from Pasir Ris to Raffles Place; although impossible in real life Grin Grin  )

Attention please. The last train to Marina Bay is arriving. The last train to Marina Bay is arriving. Passengers traveling towards Marina Bay, please proceed to the platform now. Thank you.

(The last train to Marina Bay in the Circle Line)


Reply
#14
(25 March 2015, 10:58 PM)LondonUndergroundFan233 Wrote:   Show/Hide

The motors not confirmed yet.
Reply
#15
(11 March 2015, 06:35 PM)leonardtan Wrote:   Show/Hide

Please do not spread false information. I would like to point out that these details are NOT confirmed.

Just because the tender documents asks for tip-up seats in the design, does not mean the final train will have it. For example, the C951's ball-joint hand grips, seen in the mockup, not implemented in production.

Also, the tender document asks for "mounted brackets and power supply", which is to cater for future implementation. The trains will not be delivered with WiFi equipment. That's also stated in the article.

-1
Joey Foo
The web design/development guy.
"Have you tried the '404' page on SGTrains.com?"
joeyfoo.com @joeyfjj 

Useful links: Download openBVE / C751A
Reply
#16
151C Tender Details:


Tender Closing Date: 31/3/15
Extended Closing Date: 30/4/15
Benjamin Goh 
Forum Administrator (ORD LOH!)
SGTrains.com
Youtube | Foursquare 
Anime | Aviation | Bus | Train | Photography


今日も JR西日本をご利用くださいましてありがとうございます。この電車は環状線内回り、大阪、西九条、弁天町方面行きです。次は、桜ノ宮に泊まります。お客様にお願い致します、有線座席ではお年寄りや体の不自由なお客様、妊娠中や乳幼児をお連れのお客様がいらっしゃいましたら席をお譲り下さい。ご協力をお願いします。
Reply
#17
Got a feeling that Kawasaki will get it as usual since SMRT will have a common list of parts for maintenance.
[-] The following 1 user Likes habiTAT's post:
  • hassanul
Reply
#18
(31 March 2015, 03:13 PM)habiTAT Wrote:   Show/Hide

Probably. But this being only 12 trains (quite a small order imo) means they can try out other manufacturers too 
Benjamin Goh 
Forum Administrator (ORD LOH!)
SGTrains.com
Youtube | Foursquare 
Anime | Aviation | Bus | Train | Photography


今日も JR西日本をご利用くださいましてありがとうございます。この電車は環状線内回り、大阪、西九条、弁天町方面行きです。次は、桜ノ宮に泊まります。お客様にお願い致します、有線座席ではお年寄りや体の不自由なお客様、妊娠中や乳幼児をお連れのお客様がいらっしゃいましたら席をお譲り下さい。ご協力をお願いします。
Reply
#19
(30 March 2015, 10:45 PM)SBS6019J Wrote:   Show/Hide

The extended Closing Date is now changed to: 14/5/15

http://www.lta.gov.sg/apps/tender/defaul...e=&keyword=
Reply
#20
Hope bombardier will make a bid and win it
Taking buses after exams....
Reply


Possibly Related Threads...
Thread Author Replies Views Last Post
  Kawasaki Heavy Industries-CSR Sifang C151A Repairs (KSF) joelong243w 1,315 1,237,282 11 June 2019, 05:48 PM
Last Post: A380Lover
  End-of-Life Upgrade for Kawasaki Heavy Industries C151 nakanoben 244 88,721 25 March 2019, 02:34 AM
Last Post: busanalyser
  Delivery of Kawasaki-CRRC Sifang CT251 nakanoben 95 74,250 31 January 2019, 03:43 PM
Last Post: A380Lover
  EIS of Kawasaki Heavy Industries-CSR Sifang C151B nakanoben 332 236,274 22 May 2018, 01:29 PM
Last Post: Flip
  Delivery of Bombardier MOVIA C951/C951A youyuan 134 83,015 10 November 2017, 06:19 PM
Last Post: smrtrainlovur
  Delivery of Alstom Metropolis C751C & C830C nakanoben 196 151,485 20 November 2016, 10:20 PM
Last Post: A380Lover
  Delivery of Mitsubishi Heavy Industries Crystal Mover (C810A) nakanoben 35 16,859 02 August 2016, 05:10 PM
Last Post: smrtrainlovur
  Delivery of Bombardier Innovia APM100 (C801A) nakanoben 43 29,699 13 September 2015, 10:18 PM
Last Post: TIB1173K

Forum Jump:


Users browsing this thread: 1 Guest(s)