will there be any new train for the Bizkit panjang LRT
xavierwee 
Reply
(10 October 2017, 07:13 PM)Xav@c151b Wrote:   Show/Hide

The BPLRT already has a relatively new vehicle which entered service in 2014.

http://www.sgtrains.com/train-c801a.html


But if you are asking whether more vehicles would be bought to replace the older vehicles, it's likely. Following the recent news for the BPLRT renewal.

Quote:The Land Transport Authority said that it would be sourcing for new trains, power rail, signalling system and various other critical components.

http://www.straitstimes.com/singapore/tr...anjang-lrt
Mark Loh
Hi there! I am a railway technology enthusiast, currently studying at a polytechnic in Singapore.

North South Line for openBVE [NB: MSP - BSH]
Reply
Anyone knows. why when the SPLRT, the departing and arriving stations ann’ are the same?

Departing Sengkang for C’Vale
Please, do not lean against the doors. Next Station: Compassvale

Arriving C’vale
Please, do not lean against the doors. Next Station: Compassvale
Cheers, Javan


TRAINLOVUR
-117/118, 603/604, 858
-SMB1484R, SBS7619X, SBS3388M
-9V-SLG

Artists are lucky to have a form in which to express themselves; there is a sacredness about that, and a terrific sense of responsibility. We’ve got to do it right. Why do we have to do it right? Because that’s the whole point: either it’s right or it’s all wrong. 

~Ursula K. Le Guin
(From an interview in Jonathan White’s Talking on the Water)

~Signed by Javan

Reply
(26 November 2017, 06:37 PM)Javanlovebuses+Trains@123 Wrote:   Show/Hide

Is normal, when the train stop at the station, they announce station name only.
Reply
When Bukit Panjang LRT will be doing renewal works? Could the LRT be doing four car system?

Also if can, would it be possible to change to Crystal Mover from Bombardier Innovia APM 100?
Reply
(09 January 2018, 06:12 PM)TIB1001Z Wrote:   Show/Hide

Renewing and updating many major physical components is not as simple as updating from iOS 10 to iOS 11
Mark Loh
Hi there! I am a railway technology enthusiast, currently studying at a polytechnic in Singapore.

North South Line for openBVE [NB: MSP - BSH]
Reply
(10 October 2017, 07:06 PM)A380Lover Wrote:   Show/Hide

I was there 7.15 am and 6pm and Platform 2 was still closed. 
Anyway I feel it's kind of a waste to close the entire platform. It's like JE Platform A. I understand that maybe Platform 1 can handle the load but it just doesn't click together. In the past both platforms were used when there were lesser trains. Now with the additional C801A shouldn't there be more train trips? They spent money building Platform 4 so it's a waste of it's just used for train stabling.
Reply
Renewal of BPLRT will start first half of this year.

They are changing out the signalling systems to CBTC which complete by 2022.

19 C801 train cars will be replaced and 13 C801A trains cars will be modified with new signalling and power systems.

Bukit Panjang to Ten Mile Junction service(Svc C)will cease operation permanently by Q4 this year.

https://www.facebook.com/WeKeepYourWorld...7015246859
Reply
By the way, just to note that i rarely see two-car systems on the sengkang lrt (east loop)...i see them mostly on the west loop.
Smile C651 THE LEGEND  Smile

#savec151
Reply
BPLRT opposite. One car train rare. They are usually randomly deployed.
Just another normal train guy here Smile

Reply


Possibly Related Threads...
Thread Author Replies Views Last Post
  Thomson-East Coast Line (TEL) Discussion nakanoben 744 446,388 07 January 2019, 03:24 PM
Last Post: smrtrainlovur
  North South East West Lines (NSEWL) Discussion nakanoben 3,391 1,581,226 03 January 2019, 04:14 PM
Last Post: busanalyser
  Discussion on CJ151 - Trains for Jurong Region Line Flip 2 6,515 25 December 2018, 09:59 AM
Last Post: A380Lover
  North East Line (NEL) Discussion tranzort08 457 558,581 18 December 2018, 01:00 AM
Last Post: leonardtan
  Jurong Region Line (JRL) Discussion nakanoben 194 147,968 11 December 2018, 05:52 AM
Last Post: A380Lover
  Cross Island Line (CRL) / North Shore Line Discussion nakanoben 329 257,930 21 November 2018, 09:35 AM
Last Post: leonardtan
  Circle Line (CCL) Discussion WarGreymon X 1,764 1,405,661 28 September 2018, 03:27 PM
Last Post: Kitaro62
  Changi Airport Skytrain Discussion nakanoben 107 126,105 27 August 2018, 12:24 AM
Last Post: A380Lover
  Sentosa Express Discussion Scania96-101/102 134 128,233 17 August 2018, 12:03 PM
Last Post: busanalyser
  Discussion on CR151 - Replacement Trains for North-South / East-West Lines nakanoben 68 22,732 02 August 2018, 09:52 AM
Last Post: busanalyser

Forum Jump:


Users browsing this thread: 1 Guest(s)