Thread Rating:
  • 3 Vote(s) - 4.67 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Changi Airport Skytrain Discussion
#31
(13 December 2011, 07:33 PM)willischong Wrote:   Show/Hide

Thanks!Smile
"The best preparation for tomorrow is to do your best today."
- H. Jackson Brown, Jr.

Heart C651 211/212, TIB1173K.

Facebook 
Youtube: TIB1173K Video Productions.
Reply
#32
Now at T2 Transit Hall waiting for my flight to Phuket.

I just took the Skytrain System south of T2 and T3, the system which cannot be accessed by public and only for people transiting in Singapore.

Unlike the main system near the Control Tower there, the seats here are orange instead of blue and set numbers run from 11 - 16

At T3, there are 2 island platforms with 3 tracks running thru. 2 of them is for the Gate A15-A21 shuttle and one for T2-T3 service.

For today, Crystal Mover Sets 11-13 currently serving T2-T3 service; Set 14 parking at the first Gate A15-A21 shuttle platform, not in operation as of now and probably operates during peak hours; Sets 12 and 16 in the T3 depot and Set 15 currently serving the A15-A21 shuttle.
[-] The following 1 user Likes Ethan777's post:
  • SMB157S
Reply
#33
There would be a extension to T4 when it is built right or not? Just asking...Big GrinBig GrinBig Grin
Yours sincerely,
gs97
Reply
#34
(17 December 2011, 09:42 PM)gs97 Wrote:   Show/Hide

it'll definitely be built... this goes without saying...
-SMB157S

BEEP. THIS IS MAGNEMITE, YOUR LOCAL FORUM OVERLORD. FAILURE TO COMPLY WITH RULES MAY RESULT IN A BAN FROM THE FORUMS. BEEP.

★chinese new year: im a magnemite

★EREEN: ****

★EREEN: pokemon control pokemon

★chinese new year: i have magnet pull

★chinese new year: these klefkis are my slaves
[-] The following 2 users Like SMB157S's post:
  • Singtel Sticker, SmartUserID
Reply
#35
(17 December 2011, 09:42 PM)gs97 Wrote:   Show/Hide

For me i think they will extend.
"The best preparation for tomorrow is to do your best today."
- H. Jackson Brown, Jr.

Heart C651 211/212, TIB1173K.

Facebook 
Youtube: TIB1173K Video Productions.
[-] The following 1 user Likes TIB1173K's post:
  • gs97
Reply
#36
During pre-Crystal Mover era, there were only tracks at T2 side only aka the east side of Changing Airport. There were no tracks at What was to be T3 area and the depot at the Western End of T1 was not built yet.

if there were only tracks connecting T1 and T2 at the eastern end of the airport, and the depots only at the western end, where was the depot for the APMs to stable during non op hours? Or was there no depot?
[-] The following 1 user Likes Ethan777's post:
  • SMB157S
Reply
#37
(24 December 2011, 12:12 PM)Ethan777 Wrote:   Show/Hide

I'm thinking the trains simply do overnight parking at the stations...
-SMB157S

BEEP. THIS IS MAGNEMITE, YOUR LOCAL FORUM OVERLORD. FAILURE TO COMPLY WITH RULES MAY RESULT IN A BAN FROM THE FORUMS. BEEP.

★chinese new year: im a magnemite

★EREEN: ****

★EREEN: pokemon control pokemon

★chinese new year: i have magnet pull

★chinese new year: these klefkis are my slaves
Reply
#38
(24 December 2011, 08:54 PM)boredstudent49 Wrote:   Show/Hide
If Im not wrong there was an openair depot...something like the tajong pagar one...Big GrinBig GrinBig Grin
Yours sincerely,
gs97
[-] The following 1 user Likes gs97's post:
  • Singtel Sticker
Reply
#39
(24 December 2011, 09:56 PM)gs97 Wrote:   Show/Hide

Where? I dun see any empty spaces for stabling sidings platforms
[-] The following 1 user Likes Ethan777's post:
  • gs97
Reply
#40
I know some of you are arguing whether there is a Set 16 on the skytrain system.

THIS IS TRUE... it was coupled to Set 12 as of 2 January 2012 at 12.09pm in the Transit Area between Terminal 2 and 3...
Name: Ryan Lam (But you can just call me Ryan)
School: Temasek Junior College
Reps: C751B 327/328, C830 809, C151A 515/516
Youtube Channel: http://www.youtube.com/user/LamRyan1
Facebook: https://www.facebook.com/lam.ryan.52


[-] The following 1 user Likes SMRT/SBS Transit's post:
  • Ethan777
Reply


Possibly Related Threads...
Thread Author Replies Views Last Post
  Johor-Singapore RTS Discussion nakanoben 19 16,536 6 hours ago
Last Post: busanalyser
  Thomson-East Coast Line (TEL) Discussion nakanoben 746 478,403 19 September 2019, 02:07 PM
Last Post: busanalyser
  Jurong Region Line (JRL) Discussion nakanoben 201 160,957 11 September 2019, 09:26 AM
Last Post: busanalyser
  North East Line (NEL) Discussion tranzort08 458 582,162 18 August 2019, 02:50 PM
Last Post: metr0p0litain
  North South East West Lines (NSEWL) Discussion nakanoben 3,394 1,704,270 29 July 2019, 02:20 PM
Last Post: A380Lover
  Cross Island Line (CRL) / North Shore Line Discussion nakanoben 336 277,235 28 July 2019, 12:04 AM
Last Post: xDayTx_00
  Circle Line (CCL) Discussion WarGreymon X 1,768 1,464,717 27 July 2019, 11:42 PM
Last Post: xDayTx_00
  Discussion on Alstom C851E - Trains for Circle Line Stage 6/North East Line Extension nakanoben 17 20,284 25 July 2019, 11:51 AM
Last Post: A380Lover
  Discussion on CJ151 - Trains for Jurong Region Line Flip 3 20,137 13 June 2019, 03:38 PM
Last Post: A380Lover
  Sentosa Express Discussion Scania96-101/102 137 136,598 02 April 2019, 09:45 PM
Last Post: Fairprice

Forum Jump:


Users browsing this thread: 1 Guest(s)