SGTrains Forums
Rolling Stock, Depots and Future Developments - Printable Version

+- SGTrains Forums (http://forums.sgtrains.com)
+-- Forum: Singapore Urban Trains (http://forums.sgtrains.com/forumdisplay.php?fid=3)
+--- Forum: Trains Discussion (http://forums.sgtrains.com/forumdisplay.php?fid=4)
+--- Thread: Rolling Stock, Depots and Future Developments (/showthread.php?tid=2614)

Pages: 1 2 3 4 5 6 7 8 9 10 11


Rolling Stock, Depots and Future Developments - nakanoben - 07 April 2013

This is just a list of the number of rolling stock for each line and the capacity of each depot. Thought it might be confusing with all that additional orders LTA is doing.


Rolling Stock Fleet

NSEWL

C151 - 66
C651 - 19
C751B - 21
C151A - 35
C151B - 45
C151C - 12
CR151 - 66 [2022]

Total: 198

NEL

C751A - 25
C751C - 18
C851E - 6 [2025]

Total: 43

CCL

C830 - 40
C830C - 24 
C851E - 11 [2025]

Total: 75

DTL

C951 - 92 

Total: 92

TEL

CT251 - 91 [2019]

Total: 91

BPLRT

C801 - 19
C801A - 13
C801B - 19 [2020]

Total: 32

SPLRT

C810 - 41
C810A - 16 

Total: 57

Changi Skytrain

Crystal Movers (Blue Interior) - 10
Crystal Movers (Orange Interior) - 6
Crystal Movers - 6 [2019]

Total: 22

Sentosa Express

Small Type Monorail - 7

Total: 7

Info graphic by Land Transport Authority
[Image: Trains_zps07e1f129.jpg]




Depots

Estimated Capacity

NSEWL

Bishan Depot - 53 Trains
Ulu Pandan Depot - 40 Trains
Changi Depot - 35 Trains (To be demolished)
Tuas Depot - 60 Trains
East Coast Integrated Depot - 220 Trains [2024]

NEL

Sengkang Depot - 44 Trains

CCL

Kim Chuan Depot - 70 Trains

DTL

Gali Batu Depot - 42 Trains
Kim Chaun Depot (TSFB) - 7 Trains
Marina Bay Maintenance Facility - 1 Train
East Coast Integrated Depot - 75 Trains [2024]

TEL

Mandai Depot - 90 Trains [2019]
East Coast Integrated Depot - 220 Trains [2024]

JRL

Tengah Depot - ? Trains [2025]

CRL

Changi East Depot - 80 Trains [2029]

BPLRT

Ten Mile Junction Depot - ?? Trains

SPLRT

Sengkang Depot - ?? Trains



Future Developments

Expected Completion

2013
Downtown Line Stage 1


2014
Punggol LRT West Loop
North South Line Extension


2015
Opening of Kupang LRT Station on the Sengkang LRT (West Loop)
Kawasaki Heavy Industries C151 Permanent Magnet Synchronous Motor Upgrade Trial

Downtown Line Stage 2
Sengkang LRT 2 Car System Upgrade

2016
Punggol LRT 2 Car System Upgrade
Choa Chu Kang LRT Station Additional Platforms
North South East West Line Sleeper Replacement Completion 
Opening of Sam Kee LRT Station on the Punggol LRT (West Loop)
Opening of Punggol Point LRT Station on the Punggol LRT (West Loop)

2017
Tuas West Extension (Delayed - Originally Scheduled for 2016)
Downtown Line Stage 3 
North South Line Re-signalling Upgrade (Delayed - Originally Scheduled for 2016)
Sentosa Express Wireless CBTC Signalling System Upgrade
Opening of Samudera LRT Station on the Punggol LRT (West Loop)

2018
East West Line Re-signalling Upgrade
Siemens C651 Propulsion Change-out & Refurbishment Completion (Cancelled) 

2019
Thomson-East Coast Line Phase 1 
Addition of New NS12 Canberra Station on the North South Line 
Changi Skytrain Capacity Upgrade

2020
Thomson-East Coast Line Phase 2
Kawasaki Heavy Industries C151 End-of-Life Upgrade Completion (Cancelled) 

2021
Thomson-East Coast Line Phase 3

2022
Completion of Bukit Panjang LRT Re-Signalling Project

2023
Thomson-East Coast Line (East Coast Section) Phase 1
North East Line Extension
Completion of North South East West Line Track Circuit Overhaul

2024
Thomson-East Coast Line (East Coast Section) Phase 2
Downtown Line 3 Extension
New Platform At Tanah Merah MRT Station
Johor-Singapore Rapid Transit System (Delayed)
Completion of Bukit Panjang LRT Power Rail Replacement Works & Removal of Old Track Circuits

2025
Circle Line Stage 6
TE22A Founders' Memorial (TEL)

2026
Jurong Region Line 1
Singapore-Kuala Lumpur High-speed Rail (Delayed - Originally Scheduled for 2020)

2027
Jurong Region Line 2

2028
Jurong Region Line 3

2029
Cross Island Line 1


Info Graphic by Land Transport Authority
[Image: Lines_zpsa87607a2.jpg]




Rolling Stocks

NSEWL

Kawasaki Heavy Industries C151 (KHI)
Siemens C651 (SIE)
Kawasaki Heavy Industries & Nippon Sharyo C751B (KNS)
Kawasaki Heavy Industries & CSR Sifang Co Ltd C151A (KSF) - [Batch 1/Batch 2]
Kawasaki Heavy Industries & CSR Sifang Co Ltd C151B (KSFB)
Kawasaki Heavy Industries & CRRC Qingdao Sifang Co Ltd C151C (KSF)
CR151 - [2023]

NEL

Alstom Metropolis C751A
Alstom Metropolis C751C
C851E - [2025]

CCL

Alstom Metropolis C830
Alstom Metropolis C830C
C851E - [2025]

DTL

Bombardier MOVIA C951 

TEL

Kawasaki Heavy Industries & CSR Sifang Co Ltd CT251 - [2019]

BPLRT

Bombardier Innovia APM 100 (C801)
Bombardier Innovia APM 100 (C801A)
Bombardier Innovia APM 300 (C801B) - [2022]

SPLRT

Mitsubishi Heavy Industries Crystal Movers (C810)
Mitsubishi Heavy Industries Crystal Movers (C810A)

Changi Skytrain

Mitsubishi Heavy Industries Crystal Movers (Blue/Orange Interior)


Sentosa Express

Hitachi Small Type Monorail




Last Updated: 25 Jan 2019

Moderator Notice:
Feel Free to contribute what you know. Cheers!

*Disclaimer: The information here may not be accurate. SGTrains will not be held liable or responsible for any conflicts or damages caused by use of information from this site.


RE: Rolling Stock, Depots and Future Developments - C151 - 061/062 - 07 April 2013

NEL:
Sengkang Depot holds up to 40 trains in total.

CCL & DTL:
Kim Chuan Depot holds up to 73 trains in total, not 77.


RE: Rolling Stock, Depots and Future Developments - A380Lover - 07 April 2013

(07 April 2013, 09:36 PM)masterchief Wrote:   Show/Hide

For Sengkang Depot, where's the sources?

For Kim Chuan Depot, the number is stated on wikipedia.


RE: Rolling Stock, Depots and Future Developments - C151 - 061/062 - 07 April 2013

(07 April 2013, 09:36 PM)littlearea Wrote:   Show/Hide

They must be in here, if i am not wrong.
http://sgwiki.com/wiki/Trains_in_Depots


RE: Rolling Stock, Depots and Future Developments - HigKang - 07 April 2013

(07 April 2013, 09:41 PM)masterchief Wrote:   Show/Hide

Even SgWiki and Wiki has stated that KCD can hold a maximum of 77 trains. And you said is 73...


RE: Rolling Stock, Depots and Future Developments - A380Lover - 07 April 2013

(07 April 2013, 09:41 PM)masterchief Wrote:   Show/Hide
Don't forget they stated above is "Estimated Capacity". We not sure the actual number as some depots like Bishan, Ulu Pandan and Sengkang Depot are building new sildings.


RE: Rolling Stock, Depots and Future Developments - C151 - 061/062 - 07 April 2013

2030:
Add on: North East Line Extension


RE: Rolling Stock, Depots and Future Developments - nganmatthias - 07 April 2013

(07 April 2013, 09:36 PM)masterchief Wrote:   Show/Hide

(07 April 2013, 09:36 PM)littlearea Wrote:   Show/Hide

(07 April 2013, 09:41 PM)masterchief Wrote:   Show/Hide

(07 April 2013, 09:44 PM)HigKang Wrote:   Show/Hide

Those are open-source information and should not be used as reliable cross-references for accurate information.


RE: Rolling Stock, Depots and Future Developments - A380Lover - 07 April 2013

(07 April 2013, 08:47 PM)SBS6019J Wrote:   Show/Hide

For the Eastern Region Line, i don't think i will complete on 2020 as the Thomson Line Phase 3 will complete on 2021. Eastern Region Line is continues with Thomson Line. So it should be after 2021.


RE: Rolling Stock, Depots and Future Developments - nakanoben - 07 April 2013

(07 April 2013, 09:56 PM)littlearea Wrote:   Show/Hide

According to LTA its 2020. Refer to Link below~

http://www.lta.gov.sg/content/ltaweb/en/public-transport/projects/eastern-region-line.html